201.722.1414 info@BPEquip.com
  • Facebook
  • Twitter
  • Google
  • Facebook
  • Twitter
  • Google
  • SHOP
0 Items
bpe
  • HOME
  • ABOUT US
    • CLIENT TESTIMONIALS
    • FAQ
    • REFERRAL PROGRAM
  • SAVINGS
  • LEARN MORE
    • CASE STUDIES
    • ERV MYTHS
    • CLEAN ENERGY HVAC
    • ERV TECHNOLOGY: BPE RAISES THE BAR!
    • UNDERSTANDING THERMAL COMFORT
    • BUILDING PERFORMANCE EQUIPMENT, INC.® (BPE) TERMINOLOGY
  • PRODUCTS
  • REPS
  • BLOG
  • CONTACT US FOR A QUOTE
  • SHOP
Select Page
Case Study: Avidan Management

Case Study: Avidan Management

by Haglid Engineering | Sep 30, 2021 | Case Study

Client: Avidan Management’s Industrial Complex at 145 Talmadge Road in Edison, NJ. Challenge: Avidan Management’s 656,000-sq.ft. property had been labeled a ‘gas guzzler,’ making at least 200,000 sq.ft. of the structure challenging to rent. The facility included...

Recent Posts

  • The BPE-SC-UNI-3000: Integral ERV Innovation for Your Unique HVAC Needs.
  • Energy Recovery Aboard the Battleship New Jersey
  • CNC Environments Need Optimal Climate and Ventilation Solutions
  • One Ventilation Solution to Rule Them All
  • BPE’s Fans and Controllers of Choice

Tags

backup blockchain BPE energy recovery BPE ERV Building Contractors Clean Energy Cloud Cloud Computing Cloud Services Cooling Energy Recovery Credit Cards Cryptocurrency Cyber Security data recovery ductwork Energy-efficient Energy Recovery ERV ERV case study ERVs Haglid Engineering Health High-Efficiency Building How to Reduce Energy HVAC IAQ indoor air quality Lower energy bills monitoring Net-Zero Buildings network PCI Compliance RV case study Sustainability Sustainable Engineering Sustainable HVAC Ventilation System Designs Ventilation Systems
  • Privacy Policy

201.722.1414

 
  • Facebook
  • Twitter
  • Google

© BPE

Powered by