by zamaslie | Aug 25, 2022 | Case Study
Challenge: When April and Sam Kuhn set out to open Grateful Heads, a beauty salon, they needed to renovate the property they bought to local codes. Ventilation was a key area to consider given typical salon activities and chemicals that can lead to poor indoor air...
by Haglid Engineering | Aug 25, 2022 | Case Study
Client: Manufacturing Facility and Office Suite in Northern New Jersey Challenge: A 2,000-square-foot office suite with central heating and air-conditioning had serious Indoor Air Quality (IAQ) issues due to a manufacturing and welding facility situated directly...
by zamaslie | Jul 20, 2022 | Case Study
Challenge: When fresh air exchange is poor, machine shops are known for exposing occupants to chemicals, oils, solvents, hotter ambient air temperatures, and sometimes humidity. This typical screw machine shop turns long bars into custom parts. The oil-based coolants...
by zamaslie | Jun 14, 2022 | Case Study
Challenge: When a group of Carmelite monks in Wyoming needed more living space, they reduced costs on building a stone European Gothic monastery by carving and installing the limestone and sandstone themselves. The learning curve and time commitment for learning...
by Haglid Engineering | Dec 17, 2021 | Case Study
Challenge: Prof. Klas Haglid, P.E., R.A., C.E.M, and CEO of Haglid EngineeringTM and Building Performance Equipment, Inc. makes sure his commercial headquarters is a shining example of the energy-efficient building-stock solutions he promotes. The 10,000-sq.ft....
by Haglid Engineering | Sep 30, 2021 | Case Study
Client: Avidan Management’s Industrial Complex at 145 Talmadge Road in Edison, NJ. Challenge: Avidan Management’s 656,000-sq.ft. property had been labeled a ‘gas guzzler,’ making at least 200,000 sq.ft. of the structure challenging to rent. The facility included...