by Haglid Engineering | Sep 26, 2021 | Case Study
Client: Marty’s Reliable Cycle in Morristown, NJ. Challenge: The challenge for Haglid Engineering was to renovate an existing retail bicycle shop, which was originally built as a home in the late 1800s, to achieve certification under LEED® for Commercial...
by Haglid Engineering | Sep 26, 2021 | Case Study
Client: Interlakes Animal Hospital in Meredith, NH. Challenge: The indoor air quality (IAQ) issue in this veterinary setting was quite obvious; strong odors from the animals posed a serious comfort problem. Fresh air needed to be brought into various parts of...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Manitoba Hydroelectric in Manitoba, Canada Challenge: Manitoba Hydroelectric, Manitoba’s lead energy utility, purchased a BPE ERV for the purposes of instrumenting and evaluating the need for fresh outdoor air in below freezing conditions in an area of...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Hunterdon Regional High School in NJ. Challenge: The goals of this project were to conduct an energy audit on Hunterdon Central Regional High School’s energy consumption, establish baselines for energy efficiency, and identify opportunities to reduce...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Hopewell Valley Regional School District, Pennington, NJ Challenge: Hopewell Valley Regional School District sought to boost energy-efficiency throughout six school buildings and provide students and staff with improved indoor air quality (IAQ). Haglid...